PROJECTS

KHUZDAR Map

KHUZDAR

  • INTRODUCTION

     

    Khuzdar Lot covers 10% of the area and 6.3% of the total estimated population of Balochistan and includes Khuzdar districts. The areas included in Khuzdar Lot span from 25.714242o to 28.861427o N and from 65.564013o to 67.429590o E. This Lot shares borders with Larkana and Dadu Districts in the East, Aawran, Panjgoor and Washuk in the West, Kalat in North and Lasbela Districts in the South.

     

    Auction Details:

     

    Lot ID: 

    RTeS/Lot17-Khuzdar/2016

    Advertised On:

    14th January 2016

    Bidders Registered:

    1. Pak Telecom Mobile Limited (Ufone)

    2. Pakistan Telecommunication Company Limited (PTCL)

    3. Telenor Pakistan Pvt. Ltd

    4. Pakistan Mobile Communication Ltd. (Mobilink)

    5. CMPak Limited.

    Opening of Qualification & Services Proposals:

     

    M/s PTML, Telenor and PMCL submitted the Qualification & Services and Subsidy Proposals on 21st March 2016.

    Qualification & Services proposals were opened on the same day.

    Financial Bid Opening of Technically Qualified Bidders:

    All three bidders were declared Technically Qualified and Subsidy Proposals were opened on 25th April 2016. Subsidy requested is as follows;

    PTML Capex Subsidy

    PTML Opex Subsidy

    Pak Rs. 2,189,000,000/-

    Pak Rs. 229,494,352/-

    Telenor Capex Subsidy

    Telenor Opex Subsidy

    Pak Rs. 5,249,668,932/-

    Pak Rs. 275,537,190/-

    PMCL Capex Subsidy

    PMCL Opex Subsidy

    Pak Rs. 5,447,465,517/-

    Pak Rs. 545,196,580/-

    Result:

    M/s Pak Telecom Mobile Limited (Ufone) was declared as the lowest qualified bidder and contract, worth Pak Rs. 2,418,494,352/-, was signed with PTML on 9th September 2016.

    Current Status:

    Contract has been signed with M/s Pak Telecom Mobile Limited (Ufone)

    Technical Audit

    Offer Date

    Audit Start Date

    Audit Completion Date

    TA of Milestone 1 (25% Work)

    07-Mar-2017

    10-Apr-2017

     23-Apr-2017

    TA of Milestone 2 (50% work)

     09-July-2017

    31-Jul-2017

    04-Oct-2017

    TA of Milestone 3 (75% Work)  07-Sep-2017  17-Oct-2017  04-Jan-2018

    TA of Milestone 4 (100% Work)

     02-May-18  05-Jul-18  15-Sept-18

    Mauzas:

     

    PCOs

    Telecenters

    Contracted

    Covered

    Audited

    Contracted

    Covered

    Audited

    Contracted

    Covered

    Audited

    772

    394

    394

    -

    -

    -

    -

    -

    -

     

    Information Package